Skip to main content
Create Free Account

Free eBook & Checklist

Approved for the Panel Is Not Checked Tonight.

What is your utility responsible for when contractors work on your network, and what should you check before they start? This free 30-page eBook answers both, and shows what to keep.

  • 30 pages, PDF
  • 21-point pre-start checklist
  • Current to November 2026
  • Every source listed and dated
Page 2 of the guide: the short version in five numbered points, and the list of chaptersPage 11 of the guide: supply-authority work and network controls, a table of permits and isolations, network authorisation, fitness for the shift, handback, and what to do when the check cannot be done The cover of the ComplyFlow contractor compliance guide for utilities: a worker in a hi-vis vest reads a tablet at a depot, with service vehicles and a crew behind, over the title in white and green
For electricity, gas, water, and telecommunications networks

Download

The Contractor Compliance Guide for Utilities.

The line crew, the civil contractor, the traffic controller, and the cleaner at the treatment plant all work under your duty. What Australian law asks of utilities when contractors work on their networks, and how to prove you met it.

  • Who holds the duty, and why it is shared but never handed over
  • Electrical work, the dig, confined spaces, and critical infrastructure
  • A 21-point pre-start checklist, a worked example, a network access map, and an incident card

30 pages, PDF, 10.6 MB. Current to November 2026. General information, not legal advice.

Free eBook

The Contractor Compliance Guide for Utilities

Four quick details, then the 30-page PDF downloads straight away.

Then try it on your own contractors.

The Starter plan is free for up to 5 users and 5 sites. Or see the record the eBook describes in a demo.

The Film

The eBook in Just Over 2 Minutes.

The Utilities contractor compliance eBook in a film of just under 3 minutes: who holds the duty, why it matters, what good looks like, and how to get there.

2 minutes 50 seconds. Captioned, with a voice-over. No sound needed.

Read the Film
  1. What is your utility responsible for when contractors work on your network, and what should you check before they start?
  2. This guide answers four things: who holds the duty, why it matters, what good looks like, and how to get there.
  3. Most work on a network is done by other businesses. The line crew, the civil contractor, the traffic controller, and the cleaner at the treatment plant all work under your duty.
  4. A cable replacement under a suburban street puts the utility, the civil contractor, the traffic control company, the vegetation crew, and another utility's assets in one trench.
  5. Construction work on or near energised electrical installations or services is high risk construction work, which needs a safe work method statement before it starts.
  6. Before anyone digs, get the services information, pass it on, and find the services on the ground.
  7. A technician alone at a reservoir, or a patrol on a rural line at night, is doing remote or isolated work: work isolated from help because of location, time, or the nature of the work.
  8. It needs a system of work that includes effective communication with the worker.
  9. Decide who watches the check-ins, and what a missed one triggers.
  10. A check-in covers work outside the space: entry into a confined space still needs the standby person, communication, and practised rescue.
  11. Larger networks carry a second, Commonwealth duty. It is about security, not only safety. And it names contractors.
  12. Our recommendation: record which asset class applies, and why, rather than inferring it from the utility's size.
  13. A water utility in a state that uses the model laws, 10 pm on a Friday.
  14. A main has burst under a suburban street with overhead power lines and a gas main beside it.
  15. Three contractors are called out.
  16. Nobody knows who is still on site at 2 am.
  17. A contractor approved for the panel says little about the worker at the substation tonight.
  18. Our recommendation: check each worker's licence, ticket, and competence for the task, at the site, before the work; for a high risk work licence, seeing it first is the law.
  19. Take one depot or maintenance contract, fill in its row of the access map on page 26 and its incident card on page 27, and run the checklist on pages 24 and 25 against its contractors.
  20. Every check in this guide has to work at every depot and every site, staffed or not, storm night included.
  21. ComplyFlow is Contractor Management Software: the full contractor lifecycle, on one record.
  22. Get the free guide and checklist at complyflow.com.

What Is Inside

Eleven Chapters, From the Duty to Every Site.

Written for the people who run electricity, gas, water, and telecommunications networks. Open a page to see it as it prints.

  1. 01The practical test: what you can show, at every site
  2. 02Who holds the duty, and shared duties
  3. 03Officers: due diligence is personal
  4. 04Where the laws differ
  5. 05Electrical work on and near the network
  6. 06Lines overhead, services underground
  7. 07Confined spaces, field hazards, and stopping work
  8. 08Critical infrastructure: the people who can reach the asset
  9. 09A burst water main on a suburban street
  10. 10The record, the checklist, the access map, and the incident card
  11. 11One standard across the network: questions to ask
Page 2 of the guide: the short version in five numbered points, and the list of chapters
Page 2 of 30: The Short Version
Page 11 of the guide: supply-authority work and network controls, a table of permits and isolations, network authorisation, fitness for the shift, handback, and what to do when the check cannot be done
Page 11 of 30: Network Controls
Page 24 of the guide: the checklist to run before a contractor starts, each line tagged law, policy, or good practice
Page 24 of 30: The Checklist
Page 26 of the guide: the network access map, a table to fill in with one row per depot, asset, or site, and how to keep it true
Page 26 of 30: The Network Access Map
Get the Full eBook

Questions

Questions People Ask About the eBook.

Who is the eBook for?

Electricity, gas, water and wastewater, and telecommunications utilities in every state and territory: the network, operations, safety, and procurement teams who engage contractors, and the officers who carry the due diligence duty.

What does the law say before anyone digs?

Whoever manages or controls the workplace must take all reasonable steps to get current underground services information before digging starts, and give it to the contractor doing the digging. Plans are indicative only, so our recommendation is to locate the services on site before the dig.

Does critical infrastructure law reach contractors?

Yes, for a critical electricity, gas, or water asset, or a carrier's or larger carriage service provider's critical telecommunications asset. Its responsible entity must identify its critical workers, contractors included, and let them reach critical components only once they are assessed as suitable.

Is the eBook free?

Yes. It is a 30-page PDF, free to download. Give us your name, company, and work email, and it downloads straight away.

Is this legal advice?

No. It is general information about the law as it stood when it was written, with every source listed and dated on the last page. For a decision about your own business, ask your own adviser.

How current is it?

It is current to November 2026. It follows the model WHS laws as at 5 December 2025 and the Security of Critical Infrastructure Act as at 4 June 2026, with its risk management program Rules as at 10 June 2026; sources read between 5 and 16 November 2026.

Check Once. Prove It on Every Job.

The eBook shows what to hold for every contractor and worker. ComplyFlow keeps it on one record, checked once and current at every depot and site.

  • ISO 27001 since 2019
  • Sydney-based since 2009
  • Data hosted on AWS in Australia