| Prequalify an EPC or fit-out contractor | Contractor registers once; insurances, licences, and safety documents uploaded online. | Expiry reminders and re-approvals go out on their own. | Certificates and safety documents read against your requirements; gaps shown. |
| Induct and clear a Worker for the facility | Facility-specific induction on the Worker’s phone, on top of their company’s general induction. | An expired licence, ticket, or security clearance blocks sign-in until it is renewed. | Electrical licences and HV switching authorisations checked as they are uploaded. |
| Sign in and escort at the access point | QR code or tablet at the access point replaces the sign-in book and visitor register. | Record checked at the door: not cleared, not in. The live list updates itself. | Ask your AI assistant who is on site right now, via MCP. |
| Raise the MOP and open the change window | The method of procedure for work in a live hall is raised and reviewed on a phone. | Routed to your named authoriser; the change window opens only once it is signed off. | The MOP behind the change is read against your standard before approval. |
| Permit hot works, HV switching, and battery room access | Hot works, HV isolation, and lithium-ion battery room permits raised and tracked by hall. | The crew signs in to the permit itself, and it closes with a time-stamped record of who was on it. | The switching authorisation and the permit are checked against each other before approval. |
| Keep site documents current | Fire, evacuation, and facility certification documents, one place per hall. | Visibility rules decide who sees what; expiries flagged. | Documents reviewed against criteria you set; AI suggests the criteria. |
| Commission and test a new build | Integrated systems testing sign-off tracked trade by trade before handover. | Every trade’s sign-off is checked before the facility is declared live. | Commissioning certificates and integrated systems test records read against your standard as they are uploaded. |
| Report to the operator or the board | One searchable record per hall, not a folder per facility. | Live completion rates and scheduled reports into Power BI. | Ask in plain English through ChatGPT, Claude, or Copilot; the answer comes from the record. |